IRTUM – Institutional Repository of the Technical University of Moldova

Staţie hidroelectrică pentru producerea energiei pe conducta de aducţiune la rezervoarele staţiei de pompare „Ciocana”

Show simple item record

dc.contributor.author PLEŞCA, P.
dc.contributor.author ŞARAGOV, I.
dc.contributor.author PLEŞCA, A.
dc.date.accessioned 2020-09-28T14:16:46Z
dc.date.available 2020-09-28T14:16:46Z
dc.date.issued 2013
dc.identifier.citation PLEŞCA, P., ŞARAGOV, I., PLEŞCA, A. Staţie hidroelectrică pentru producerea energiei pe conducta de aducţiune la rezervoarele staţiei de pompare „Ciocana”. In: Cadastru și Drept. Vol.33, 27 septembrie 2013, Chișinău. Chişinău, 2013, pp. 208-215. ISBN 978-9975-64-125-8. en_US
dc.identifier.isbn 978-9975-64-125-8
dc.identifier.uri http://repository.utm.md/handle/5014/10052
dc.description.abstract Increase of generation hidraulic power meams optimization of hydrostation. Measurement procedure of main parametrs of hydroturbine and optimization of hydrostation of the Tohatin-Ciocana water suplz sistem. Evaluation of the measurement results, hydroturbines regimes efficiencies of the hydraulics energies are done. en_US
dc.language.iso ro en_US
dc.publisher Universitatea Agrară de Stat din Moldova en_US
dc.rights Attribution-NonCommercial-NoDerivs 3.0 United States *
dc.rights.uri http://creativecommons.org/licenses/by-nc-nd/3.0/us/ *
dc.subject optimization of hydrostation en_US
dc.subject measurement results en_US
dc.subject regimes optimitions en_US
dc.title Staţie hidroelectrică pentru producerea energiei pe conducta de aducţiune la rezervoarele staţiei de pompare „Ciocana” en_US
dc.type Article en_US


Files in this item

The following license files are associated with this item:

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 United States Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 United States

Search DSpace


Browse

My Account