DSpace Repository

Bloc locativ cu regim în elevaţie P+5E+M amplasat pe strada Ştefan cel Mare, oraşul Căuşeni

Show simple item record

dc.contributor CÎRLAN, Alexandru
dc.contributor CEBOTARI, Victor
dc.contributor MARIAN, Maria-Liliana
dc.contributor OLARU, Efim
dc.contributor.advisor SÂRBU, Teodor
dc.contributor.author MÎNZA, Alexandru
dc.date.accessioned 2024-06-14T10:28:34Z
dc.date.available 2024-06-14T10:28:34Z
dc.date.issued 2024
dc.identifier.citation MÎNZA, Alexandru. Bloc locativ cu regim în elevaţie P+5E+M amplasat pe strada Ştefan cel Mare, oraşul Căuşeni: proiect de licență: Programul de studiu: 0732.1-Construcţii Industriale şi Civile. Cond. şt. SÂRBU Teodor. Universitatea Tehnică a Moldovei. Chişinău, 2024. en_US
dc.identifier.uri http://repository.utm.md/handle/5014/27410
dc.description Fişierul ataşat conţine: Rezumat, Abstract, Cuprins, Concluzii, Bibliografie. en_US
dc.description.abstract Prezentul proiect, este alcătuit din memoriu explicativ, și partea grafică.Memoriul explicativ este structurat pe 7 capitole,concluzii și bibliografie,2 anexe, fiind alcătuit din 101 de pagini format A4. Capitolul I ,, Arhitectura Construcțiilor” este alcătuit din 4 colia A1, unde găsim reprezentat planul general a construcției la scara 1:250, tabelul cu indici tehnico-economici, plan situație, plan parter împreună cu plan etaj, 2 secțiuni prin construcție, una longitudinală, iar cealaltă transversala, care trec prin scara, și fațade. Capitolul II ,, Rezistența Construcțiilor” este expus în 3 coli formatul A1, ce includ desene de cofraj, și detalierea armării elementelor, cu necesar de materiale. În acest capitol a fost efectuat calculul elementelor structurale a clădirii, utilizând metoda elementelor finite, cu ajutorul softului SCAD Office. Capitolul II ,, Geotehnică și fundații ” a fost capitolul unde am determinat și efectuat analiza solurilor, ce vor susține viitoarea construcție, ca rezultat am obținut 2 tipuri de fundații continuie de suprafață, fiind expus în o coală format A1. Capitolul IV ,, Tehnologia Construțiilor ” a fost abortată tema executării infrastructurii construției. Unde au fost expuse soluțiile de executare a lucrărilor de terasament, dar și executarea lucrărilor de betonare și armare a fundațiilor. Capitolul V ,, Organizarea ” a fost capitolul rezervat pentru calculul necesar pentru elaborarea planului general de organizare a șantierului, precum și graficul executării lucrărilor, dar și necesarul forței de muncă. Capitolul VI ,, Economia Construcțiilor ” în cadrul acestui capitol am determinat valoarea, dar și costul devizului pentru viitoarea construție. Capitolul VI ,, Securitatea activității vitale ” a fost capitolul unde am expus măsurile pentru a evita accidentele de muncă, dar și prevenirea lor, pentru a asigura cele mai sigure condiții de muncă pentru muncitori. en_US
dc.description.abstract The project comprises an explanatory memorandum and graphic part. The explanatory memorandum is structured into 7 chapters, conclusions, and bibliography, with 2 appendices, totaling 70 A4 pages. Chapter I, "Construction Architecture," consists of 4 A1 sheets, including the general plan of the construction at a 1:250 scale, the table with technical-economic indices, site plan, ground floor plan together with floor plan, 2 sections through the construction, one longitudinal and the other transversal, passing through the staircase, and facades. Chapter II, "Construction Resistance," is presented on 3 A1 sheets, including formwork drawings and detailing of reinforcement elements with material requirements. In this chapter, structural element calculations were performed using the finite element method with the SCAD Office software. Chapter III, "Geotechnics and Foundations," involved the analysis of soils supporting the future construction, resulting in 2 types of continuous surface foundations, presented on one A1 sheet. Chapter IV, "Construction Technology," addressed the execution of the construction infrastructure, presenting solutions for earthworks, concrete works, and reinforcement of foundations. Chapter V, "Organization," was dedicated to calculating the requirements for developing the site's general organization plan, as well as the work schedule and labor force needs. Chapter VI, "Construction Economics," determined the value and cost of the bill of quantities for the future construction. Chapter VII, "Vital Activity Security," outlined measures to prevent workplace accidents and ensure the safest working conditions for laborers. The bachelor's project is elaborated in accordance with the requirements of the valid normative acts in the Republic of Moldova. en_US
dc.language.iso ro en_US
dc.publisher Universitatea Tehnică a Moldovei en_US
dc.rights Attribution-NonCommercial-NoDerivs 3.0 United States *
dc.rights.uri http://creativecommons.org/licenses/by-nc-nd/3.0/us/ *
dc.subject bloc locativ en_US
dc.subject clădiri de locuit en_US
dc.subject fundații continue en_US
dc.subject general plan en_US
dc.subject structural elements en_US
dc.subject continuous foundation en_US
dc.title Bloc locativ cu regim în elevaţie P+5E+M amplasat pe strada Ştefan cel Mare, oraşul Căuşeni en_US
dc.title.alternative Residential building with a height regime of G+5F+UG located on Ştefan cel Mare Street, in the city of Căuşeni en_US
dc.type Thesis en_US


Files in this item

The following license files are associated with this item:

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 United States Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 United States

Search DSpace


Advanced Search

Browse

My Account